| OE source and tank variant | Record the complete module reference from its label or parts source. Note model year, vehicle, engine code or displacement, fuel type, tank variant and destination. | Check the application record against the exact module and tank identification. Record any conflicting reference before the review. |
|---|
| Flange, ports and height | Send a dimensioned view of the flange, seal interface, installed envelope and fuel-port positions. Include connector face and keying photos. | Compare the assembly drawing and proposed sample against the documented tank interface, connection points and orientation. |
|---|
| Required module contents | Specify complete module or pump insert and list the required strainer, seal, reservoir, pressure-control parts and fuel-level sender where applicable. | Obtain an itemized list and sample photos. For a required sender, request the documented output range and float geometry for the tank variant. |
|---|
| Pump and material evidence | State your documented flow and pressure points, voltage, electrical interface and fuel compatibility requirements. Include any leak-test acceptance criteria. | Compare test results at the same pressure, flow, voltage and test conditions. Ask which materials, sample revision and test method the evidence covers. |
|---|
| Packing and identification | Specify neutral or private-label boxes, traceability marks and protection for ports and any float arm. State the packaging evidence required for approval. | Compare the pack proof and sample with the proposed module contents and confirm the actual carton dimensions and weight. |
|---|
| First order and forecast | Give initial and annual quantities by module, tank variant and packaging version. Include the requested schedule and destination. | Request quote tiers and minimums in complete modules or inserts, as specified, with separate lines for included options. |
|---|